Pack
monopack part A 2.4 kg + part B 0.6 kg
part A bucket 7 kg, part B bucket 1.75 kg
Coverage
construction joints on rough substrates ≈ 0.7 – 1 kg/m²
construction joints on irregular substrates≈ 1 – 2 kg/m²
bonding of prefabricated elements ≈ 1.6 kg/m² per mm of thickness
sealing of cracks ≈ 1.6 kg/dm³
synthetic finishing (ratio 1:2 Epobinder:Quarzo 1.7) ≈ 0.67 kg/m² per mm of thickness
synthetic screed (ratio 1:4 Epobinder:Quarzo 1.7) ≈ 0.38 kg/m² per mm of thickness
Shelf life
≈ 12 months